
Road Improvements Coming to Perinton Neighborhoods
Residents may soon spot new orange signs at neighborhood entrances as the Town of Perinton Highway Department launches a major round of summer roadway maintenance. The town plans to treat roughly 18 miles of local roads with a pavement‑preservation method known as Chip Seal, a cost‑effective process widely used to extend the life of existing asphalt and reduce long‑term repair needs.
The Chip Seal process begins with a light application of liquid asphalt, followed by stone that is rolled into the surface. Crews return a few days later to sweep up any loose material. One to three weeks afterward, the Highway Department applies a fog seal to secure the stone, strengthen the roadway, and deliver a smoother, more consistent appearance.
According to town officials, Chip Seal helps guard against water infiltration, sun damage, and oxidation, seals minor cracks before they spread, and extends the life of existing pavement. The process also avoids long closures, reducing traffic impacts for residents.
Residents can view the full list of planned Chip Seal locations by scanning the QR code displayed on neighborhood signs or by visiting the town’s project page at perinton.gov. Anyone with questions may contact the Perinton Department of Public Works at (585) 223‑5115.


